24 January 2008

Siding & Trim

Construction continues at a rapid pace. Batts are being added over the top of the siding, door and window trim is being installed and the flashing for the roof is going up before the dormer siding is done.

The upstairs has been turned into an additional workroom with saws and all sorts of activity. The entire building is looking really nice and I'm amazed at the level of detail that goes into finishing the siding on the dormers and getting everything installed properly.

No comments:

Post a Comment