12 September 2008

More Solar Work

25 August and the heat dump loop is complete.


Next was to work on the actual panel mounting structure. First step was to get the blocks that will be used to provide the spacing for the braces installed. That got finished on 11 September. The next day the mounting structure was started.



With the blocks secured then the actual mounting frames were installed. We have very high winds at times so these mounting frames have to be especially sturdy. They are bolted through the entire roof to the main structure of the garage. By the end of the week 12 September the structure was secure.

No comments: