
Looking down where the metal pole will fit into the plastic pipe sleeve.

Getting the first pole in place.




Once the pole was in position that was enough for the day. Tomorrow will be getting the first pole plumb and putting the mortar around it to hold it up. If there is time the second pole will be installed too.
No comments:
Post a Comment