06 December 2007
2 December Update
Shop construction continues. With the first floor walls p and the sheathing mostly done you can start to see where windows will be. This is the view out the front window from the downstairs. We had rain followed by snow so the inside of the shop floor got covered in thick ice. We helped remove it so the floor could dry and be safe to work on. All the floor joists are in place now.